Effective September 15, 2025
What changed versus each county's previous schedule. Package = base wage plus health, pension, vacation and training fringes per hour.
356
classification lines changed
Biggest moves Clinton: Plumber package 65.00 → 71.05 (+6.05) Madison: Plumber package 65.00 → 71.05 (+6.05) Monroe: Plumber package 65.00 → 71.05 (+6.05) Randolph: Plumber package 65.00 → 71.05 (+6.05) St. Clair: Plumber package 65.00 → 71.05 (+6.05)
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN BLD 40.00 42.00 +2.00 62.50 64.73 +2.23 ELECTRONIC SYSTEM TECH BLD 34.59 37.70 +3.11 57.90 61.10 +3.20 PAINTER ALL 32.82 33.82 +1.00 57.06 58.56 +1.50 PAINTER OVER 30 FT. ALL 33.82 34.82 +1.00 58.06 59.56 +1.50 PAINTER PWR EQMT ALL 33.82 34.82 +1.00 58.06 59.56 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 38.23 40.28 +2.05 57.81 61.01 +3.20 PAINTER BLD 32.47 33.79 +1.32 54.24 55.74 +1.50 PAINTER HWY 36.77 38.09 +1.32 58.54 60.04 +1.50 PAINTER OVER 30 FT. BLD 34.47 35.79 +1.32 56.24 57.74 +1.50 PAINTER PWR EQMT BLD 33.47 34.79 +1.32 55.24 56.74 +1.50 PAINTER PWR EQMT HWY 37.77 39.09 +1.32 59.54 61.04 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN ALL 49.67 52.41 +2.74 78.64 82.67 +4.03 ELECTRONIC SYSTEM TECH BLD 38.23 40.28 +2.05 57.81 61.01 +3.20 ELECTRONIC SYSTEM TECH BLD 39.14 41.76 +2.62 57.12 60.26 +3.14 IRON WORKER ALL 41.65 43.35 +1.70 72.83 75.33 +2.50 PAINTER BLD 33.49 34.49 +1.00 57.12 58.62 +1.50 PAINTER HWY 34.69 35.69 +1.00 58.32 59.82 +1.50 PAINTER OVER 30 FT. BLD 34.49 35.49 +1.00 58.12 59.62 +1.50 PAINTER PWR EQMT BLD 34.49 35.49 +1.00 58.12 59.62 +1.50 PAINTER PWR EQMT HWY 35.69 36.69 +1.00 59.32 60.82 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN BLD 40.00 42.00 +2.00 62.50 64.73 +2.23 ELECTRONIC SYSTEM TECH BLD 34.59 37.70 +3.11 57.90 61.10 +3.20 PAINTER ALL 32.82 33.82 +1.00 57.06 58.56 +1.50 PAINTER OVER 30 FT. ALL 33.82 34.82 +1.00 58.06 59.56 +1.50 PAINTER PWR EQMT ALL 33.82 34.82 +1.00 58.06 59.56 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 36.79 38.79 +2.00 57.90 61.10 +3.20 IRON WORKER ALL 41.65 43.35 +1.70 72.83 75.33 +2.50 PAINTER BLD 33.49 34.49 +1.00 57.12 58.62 +1.50 PAINTER HWY 34.69 35.69 +1.00 58.32 59.82 +1.50 PAINTER OVER 30 FT. BLD 34.49 35.49 +1.00 58.12 59.62 +1.50 PAINTER PWR EQMT BLD 34.49 35.49 +1.00 58.12 59.62 +1.50 PAINTER PWR EQMT HWY 35.69 36.69 +1.00 59.32 60.82 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 36.75 39.66 +2.91 57.90 61.10 +3.20 PAINTER ALL 32.82 33.82 +1.00 57.06 58.56 +1.50 PAINTER OVER 30 FT. ALL 33.82 34.82 +1.00 58.06 59.56 +1.50 PAINTER PWR EQMT ALL 33.82 34.82 +1.00 58.06 59.56 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN BLD 48.10 49.63 +1.53 70.37 72.14 +1.77 ELECTRONIC SYSTEM TECH BLD 36.01 38.34 +2.33 57.90 61.10 +3.20 PAINTER ALL 39.54 40.96 +1.42 58.54 60.04 +1.50 PAINTER - SIGNS ALL 39.54 40.96 +1.42 58.54 60.04 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 38.91 39.41 +0.50 57.90 61.10 +3.20 PAINTER ALL 32.82 33.82 +1.00 57.06 58.56 +1.50 PAINTER OVER 30 FT. ALL 33.82 34.82 +1.00 58.06 59.56 +1.50 PAINTER PWR EQMT ALL 33.82 34.82 +1.00 58.06 59.56 +1.50
Classification Old base New base Δ base Old package New package Δ package
PAINTER ALL 30.50 31.75 +1.25 56.12 57.62 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 38.23 40.28 +2.05 57.81 61.01 +3.20 PAINTER ALL 27.13 27.43 +0.30 49.76 51.26 +1.50 PAINTER OVER 30 FT. ALL 30.23 30.53 +0.30 52.86 54.36 +1.50 PAINTER PWR EQMT ALL 30.23 30.53 +0.30 52.86 54.36 +1.50 PIPEFITTER BLD 42.75 45.00 +2.25 64.06 66.54 +2.48 PLUMBER BLD 42.75 45.00 +2.25 64.06 66.54 +2.48
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN ALL 49.67 52.41 +2.74 78.64 82.67 +4.03 ELECTRONIC SYSTEM TECH BLD 38.23 40.28 +2.05 57.81 61.01 +3.20 ELECTRONIC SYSTEM TECH BLD 39.14 41.76 +2.62 57.12 60.26 +3.14 IRON WORKER ALL 41.65 43.35 +1.70 72.83 75.33 +2.50 PAINTER BLD 33.49 34.49 +1.00 57.12 58.62 +1.50 PAINTER HWY 34.69 35.69 +1.00 58.32 59.82 +1.50 PAINTER OVER 30 FT. BLD 34.49 35.49 +1.00 58.12 59.62 +1.50 PAINTER PWR EQMT BLD 34.49 35.49 +1.00 58.12 59.62 +1.50 PAINTER PWR EQMT HWY 35.69 36.69 +1.00 59.32 60.82 +1.50 PIPEFITTER BLD 42.75 45.00 +2.25 64.06 66.54 +2.48 PLUMBER BLD 42.75 45.00 +2.25 64.06 66.54 +2.48 PLUMBER BLD 43.75 47.85 +4.10 65.00 71.05 +6.05
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 38.91 39.41 +0.50 57.90 61.10 +3.20 PAINTER ALL 39.54 40.96 +1.42 58.54 60.04 +1.50 PAINTER - SIGNS ALL 39.54 40.96 +1.42 58.54 60.04 +1.50
Classification Old base New base Δ base Old package New package Δ package
PAINTER ALL 30.50 31.75 +1.25 56.12 57.62 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 38.91 39.41 +0.50 57.90 61.10 +3.20 PAINTER ALL 39.54 40.96 +1.42 58.54 60.04 +1.50 PAINTER - SIGNS ALL 39.54 40.96 +1.42 58.54 60.04 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 38.01 40.63 +2.62 57.90 61.10 +3.20 PAINTER ALL 31.50 31.90 +0.40 57.05 58.55 +1.50 PAINTER OVER 30 FT. ALL 32.50 32.90 +0.40 58.05 59.55 +1.50 PAINTER PWR EQMT ALL 32.25 32.65 +0.40 57.80 59.30 +1.50 PILEDRIVER BLD 39.04 41.04 +2.00 72.99 74.99 +2.00
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN BLD 48.10 49.63 +1.53 70.37 72.14 +1.77 ELECTRONIC SYSTEM TECH BLD 38.91 39.41 +0.50 57.90 61.10 +3.20 PAINTER ALL 39.54 40.96 +1.42 58.54 60.04 +1.50 PAINTER - SIGNS ALL 39.54 40.96 +1.42 58.54 60.04 +1.50
Classification Old base New base Δ base Old package New package Δ package
PAINTER ALL 30.50 31.75 +1.25 56.12 57.62 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 38.23 40.28 +2.05 57.81 61.01 +3.20
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 38.91 39.41 +0.50 57.90 61.10 +3.20 ELECTRONIC SYSTEM TECH BLD 38.23 40.28 +2.05 57.81 61.01 +3.20 PAINTER ALL 30.50 31.75 +1.25 56.12 57.62 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 38.23 40.28 +2.05 57.81 61.01 +3.20 IRON WORKER ALL 41.65 43.35 +1.70 72.83 75.33 +2.50 PAINTER BLD 33.49 34.49 +1.00 57.12 58.62 +1.50 PAINTER HWY 34.69 35.69 +1.00 58.32 59.82 +1.50 PAINTER OVER 30 FT. BLD 34.49 35.49 +1.00 58.12 59.62 +1.50 PAINTER PWR EQMT BLD 34.49 35.49 +1.00 58.12 59.62 +1.50 PAINTER PWR EQMT HWY 35.69 36.69 +1.00 59.32 60.82 +1.50 PIPEFITTER BLD 42.75 45.00 +2.25 64.06 66.54 +2.48 PLUMBER BLD 42.75 45.00 +2.25 64.06 66.54 +2.48
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN BLD 48.10 49.63 +1.53 70.37 72.14 +1.77 ELECTRONIC SYSTEM TECH BLD 36.01 38.34 +2.33 57.90 61.10 +3.20
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 38.23 40.28 +2.05 57.81 61.01 +3.20 PAINTER BLD 32.47 33.79 +1.32 54.24 55.74 +1.50 PAINTER HWY 36.77 38.09 +1.32 58.54 60.04 +1.50 PAINTER OVER 30 FT. BLD 34.47 35.79 +1.32 56.24 57.74 +1.50 PAINTER PWR EQMT BLD 33.47 34.79 +1.32 55.24 56.74 +1.50 PAINTER PWR EQMT HWY 37.77 39.09 +1.32 59.54 61.04 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN BLD 44.10 45.65 +1.55 70.70 72.42 +1.72 ELECTRONIC SYSTEM TECH BLD 34.59 37.70 +3.11 57.90 61.10 +3.20
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 38.23 40.28 +2.05 57.81 61.01 +3.20 PAINTER BLD 32.47 33.79 +1.32 54.24 55.74 +1.50 PAINTER HWY 36.77 38.09 +1.32 58.54 60.04 +1.50 PAINTER OVER 30 FT. BLD 34.47 35.79 +1.32 56.24 57.74 +1.50 PAINTER PWR EQMT BLD 33.47 34.79 +1.32 55.24 56.74 +1.50 PAINTER PWR EQMT HWY 37.77 39.09 +1.32 59.54 61.04 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 36.79 38.79 +2.00 57.90 61.10 +3.20 PAINTER BLD 33.49 34.49 +1.00 57.12 58.62 +1.50 PAINTER HWY 34.69 35.69 +1.00 58.32 59.82 +1.50 PAINTER OVER 30 FT. BLD 34.49 35.49 +1.00 58.12 59.62 +1.50 PAINTER PWR EQMT BLD 34.49 35.49 +1.00 58.12 59.62 +1.50 PAINTER PWR EQMT HWY 35.69 36.69 +1.00 59.32 60.82 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 38.23 40.28 +2.05 57.81 61.01 +3.20 PAINTER ALL 27.13 27.43 +0.30 49.76 51.26 +1.50 PAINTER OVER 30 FT. ALL 30.23 30.53 +0.30 52.86 54.36 +1.50 PAINTER PWR EQMT ALL 30.23 30.53 +0.30 52.86 54.36 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN BLD 40.00 42.00 +2.00 62.50 64.73 +2.23 ELECTRONIC SYSTEM TECH BLD 34.59 37.70 +3.11 57.90 61.10 +3.20
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 38.23 40.28 +2.05 57.81 61.01 +3.20 PAINTER BLD 32.47 33.79 +1.32 54.24 55.74 +1.50 PAINTER HWY 36.77 38.09 +1.32 58.54 60.04 +1.50 PAINTER OVER 30 FT. BLD 34.47 35.79 +1.32 56.24 57.74 +1.50 PAINTER PWR EQMT BLD 33.47 34.79 +1.32 55.24 56.74 +1.50 PAINTER PWR EQMT HWY 37.77 39.09 +1.32 59.54 61.04 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN BLD 44.10 45.65 +1.55 70.70 72.42 +1.72 ELECTRONIC SYSTEM TECH BLD 34.59 37.70 +3.11 57.90 61.10 +3.20
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN BLD 48.10 49.63 +1.53 70.37 72.14 +1.77
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 38.23 40.28 +2.05 57.81 61.01 +3.20 PAINTER BLD 32.47 33.79 +1.32 54.24 55.74 +1.50 PAINTER HWY 36.77 38.09 +1.32 58.54 60.04 +1.50 PAINTER OVER 30 FT. BLD 34.47 35.79 +1.32 56.24 57.74 +1.50 PAINTER PWR EQMT BLD 33.47 34.79 +1.32 55.24 56.74 +1.50 PAINTER PWR EQMT HWY 37.77 39.09 +1.32 59.54 61.04 +1.50
Classification Old base New base Δ base Old package New package Δ package
PAINTER ALL 30.50 31.75 +1.25 56.12 57.62 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 38.23 40.28 +2.05 57.81 61.01 +3.20 IRON WORKER ALL 41.65 43.35 +1.70 72.83 75.33 +2.50 PAINTER ALL 27.13 27.43 +0.30 49.76 51.26 +1.50 PAINTER OVER 30 FT. ALL 30.23 30.53 +0.30 52.86 54.36 +1.50 PAINTER PWR EQMT ALL 30.23 30.53 +0.30 52.86 54.36 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 36.79 38.79 +2.00 57.90 61.10 +3.20 IRON WORKER ALL 41.65 43.35 +1.70 72.83 75.33 +2.50 PAINTER BLD 33.49 34.49 +1.00 57.12 58.62 +1.50 PAINTER HWY 34.69 35.69 +1.00 58.32 59.82 +1.50 PAINTER OVER 30 FT. BLD 34.49 35.49 +1.00 58.12 59.62 +1.50 PAINTER PWR EQMT BLD 34.49 35.49 +1.00 58.12 59.62 +1.50 PAINTER PWR EQMT HWY 35.69 36.69 +1.00 59.32 60.82 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 38.23 40.28 +2.05 57.81 61.01 +3.20 PAINTER BLD 32.47 33.79 +1.32 54.24 55.74 +1.50 PAINTER HWY 36.77 38.09 +1.32 58.54 60.04 +1.50 PAINTER OVER 30 FT. BLD 34.47 35.79 +1.32 56.24 57.74 +1.50 PAINTER PWR EQMT BLD 33.47 34.79 +1.32 55.24 56.74 +1.50 PAINTER PWR EQMT HWY 37.77 39.09 +1.32 59.54 61.04 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN BLD 44.10 45.65 +1.55 70.70 72.42 +1.72 ELECTRONIC SYSTEM TECH BLD 34.59 37.70 +3.11 57.90 61.10 +3.20
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN BLD 48.10 49.63 +1.53 70.37 72.14 +1.77
Classification Old base New base Δ base Old package New package Δ package
PAINTER ALL 30.50 31.75 +1.25 56.12 57.62 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN BLD 48.10 49.63 +1.53 70.37 72.14 +1.77 ELECTRONIC SYSTEM TECH BLD 36.01 38.34 +2.33 57.90 61.10 +3.20 PILEDRIVER BLD 39.04 41.04 +2.00 72.99 74.99 +2.00
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 36.75 39.66 +2.91 57.90 61.10 +3.20 PAINTER ALL 32.82 33.82 +1.00 57.06 58.56 +1.50 PAINTER OVER 30 FT. ALL 33.82 34.82 +1.00 58.06 59.56 +1.50 PAINTER PWR EQMT ALL 33.82 34.82 +1.00 58.06 59.56 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 38.91 39.41 +0.50 57.90 61.10 +3.20 PAINTER ALL 31.50 31.90 +0.40 57.05 58.55 +1.50 PAINTER OVER 30 FT. ALL 32.50 32.90 +0.40 58.05 59.55 +1.50 PAINTER PWR EQMT ALL 32.25 32.65 +0.40 57.80 59.30 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN ALL 49.67 52.41 +2.74 78.64 82.67 +4.03 ELECTRONIC SYSTEM TECH BLD 36.75 39.66 +2.91 57.90 61.10 +3.20 ELECTRONIC SYSTEM TECH BLD 39.14 41.76 +2.62 57.12 60.26 +3.14 ELECTRONIC SYSTEM TECH BLD 36.79 38.79 +2.00 57.90 61.10 +3.20 IRON WORKER ALL 41.65 43.35 +1.70 72.83 75.33 +2.50 PAINTER BLD 33.49 34.49 +1.00 57.12 58.62 +1.50 PAINTER HWY 34.69 35.69 +1.00 58.32 59.82 +1.50 PAINTER OVER 30 FT. BLD 34.49 35.49 +1.00 58.12 59.62 +1.50 PAINTER PWR EQMT BLD 34.49 35.49 +1.00 58.12 59.62 +1.50 PAINTER PWR EQMT HWY 35.69 36.69 +1.00 59.32 60.82 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN ALL 49.67 52.41 +2.74 78.64 82.67 +4.03 ELECTRONIC SYSTEM TECH BLD 36.79 38.79 +2.00 57.90 61.10 +3.20 ELECTRONIC SYSTEM TECH BLD 39.14 41.76 +2.62 57.12 60.26 +3.14 IRON WORKER ALL 41.65 43.35 +1.70 72.83 75.33 +2.50 PAINTER BLD 33.49 34.49 +1.00 57.12 58.62 +1.50 PAINTER HWY 34.69 35.69 +1.00 58.32 59.82 +1.50 PAINTER OVER 30 FT. BLD 34.49 35.49 +1.00 58.12 59.62 +1.50 PAINTER PWR EQMT BLD 34.49 35.49 +1.00 58.12 59.62 +1.50 PAINTER PWR EQMT HWY 35.69 36.69 +1.00 59.32 60.82 +1.50 PLUMBER BLD 43.75 47.85 +4.10 65.00 71.05 +6.05
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 38.23 40.28 +2.05 57.81 61.01 +3.20 IRON WORKER ALL 41.65 43.35 +1.70 72.83 75.33 +2.50 PAINTER ALL 27.13 27.43 +0.30 49.76 51.26 +1.50 PAINTER OVER 30 FT. ALL 30.23 30.53 +0.30 52.86 54.36 +1.50 PAINTER PWR EQMT ALL 30.23 30.53 +0.30 52.86 54.36 +1.50 PIPEFITTER BLD 42.75 45.00 +2.25 64.06 66.54 +2.48 PLUMBER BLD 42.75 45.00 +2.25 64.06 66.54 +2.48
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN BLD 48.10 49.63 +1.53 70.37 72.14 +1.77 ELECTRICIAN BLD 44.10 45.65 +1.55 70.70 72.42 +1.72 ELECTRONIC SYSTEM TECH BLD 34.59 37.70 +3.11 57.90 61.10 +3.20
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN BLD 44.10 45.65 +1.55 70.70 72.42 +1.72 ELECTRONIC SYSTEM TECH BLD 34.59 37.70 +3.11 57.90 61.10 +3.20 ELECTRONIC SYSTEM TECH BLD 36.75 39.66 +2.91 57.90 61.10 +3.20
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 38.23 40.28 +2.05 57.81 61.01 +3.20
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN BLD 44.10 45.65 +1.55 70.70 72.42 +1.72 ELECTRICIAN BLD 40.00 42.00 +2.00 62.50 64.73 +2.23 ELECTRONIC SYSTEM TECH BLD 34.59 37.70 +3.11 57.90 61.10 +3.20
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN BLD 48.10 49.63 +1.53 70.37 72.14 +1.77 ELECTRONIC SYSTEM TECH BLD 36.01 38.34 +2.33 57.90 61.10 +3.20 ELECTRONIC SYSTEM TECH BLD 38.01 40.63 +2.62 57.90 61.10 +3.20 PILEDRIVER BLD 39.04 41.04 +2.00 72.99 74.99 +2.00
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 36.75 39.66 +2.91 57.90 61.10 +3.20 PAINTER ALL 32.82 33.82 +1.00 57.06 58.56 +1.50 PAINTER OVER 30 FT. ALL 33.82 34.82 +1.00 58.06 59.56 +1.50 PAINTER PWR EQMT ALL 33.82 34.82 +1.00 58.06 59.56 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN BLD 44.10 45.65 +1.55 70.70 72.42 +1.72 ELECTRONIC SYSTEM TECH BLD 34.59 37.70 +3.11 57.90 61.10 +3.20
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN ALL 49.67 52.41 +2.74 78.64 82.67 +4.03 ELECTRONIC SYSTEM TECH BLD 39.14 41.76 +2.62 57.12 60.26 +3.14 IRON WORKER ALL 41.65 43.35 +1.70 72.83 75.33 +2.50 PAINTER BLD 33.49 34.49 +1.00 57.12 58.62 +1.50 PAINTER HWY 34.69 35.69 +1.00 58.32 59.82 +1.50 PAINTER OVER 30 FT. BLD 34.49 35.49 +1.00 58.12 59.62 +1.50 PAINTER PWR EQMT BLD 34.49 35.49 +1.00 58.12 59.62 +1.50 PAINTER PWR EQMT HWY 35.69 36.69 +1.00 59.32 60.82 +1.50 PLUMBER BLD 43.75 47.85 +4.10 65.00 71.05 +6.05
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN ALL 49.67 52.41 +2.74 78.64 82.67 +4.03 ELECTRONIC SYSTEM TECH BLD 38.91 39.41 +0.50 57.90 61.10 +3.20 ELECTRONIC SYSTEM TECH BLD 36.75 39.66 +2.91 57.90 61.10 +3.20 ELECTRONIC SYSTEM TECH BLD 39.14 41.76 +2.62 57.12 60.26 +3.14 IRON WORKER ALL 41.65 43.35 +1.70 72.83 75.33 +2.50 PAINTER BLD 33.49 34.49 +1.00 57.12 58.62 +1.50 PAINTER HWY 34.69 35.69 +1.00 58.32 59.82 +1.50 PAINTER OVER 30 FT. BLD 34.49 35.49 +1.00 58.12 59.62 +1.50 PAINTER PWR EQMT BLD 34.49 35.49 +1.00 58.12 59.62 +1.50 PAINTER PWR EQMT HWY 35.69 36.69 +1.00 59.32 60.82 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 36.75 39.66 +2.91 57.90 61.10 +3.20 PAINTER ALL 32.82 33.82 +1.00 57.06 58.56 +1.50 PAINTER OVER 30 FT. ALL 33.82 34.82 +1.00 58.06 59.56 +1.50 PAINTER PWR EQMT ALL 33.82 34.82 +1.00 58.06 59.56 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 38.91 39.41 +0.50 57.90 61.10 +3.20 PAINTER ALL 31.50 31.90 +0.40 57.05 58.55 +1.50 PAINTER OVER 30 FT. ALL 32.50 32.90 +0.40 58.05 59.55 +1.50 PAINTER PWR EQMT ALL 32.25 32.65 +0.40 57.80 59.30 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN BLD 44.10 45.65 +1.55 70.70 72.42 +1.72 ELECTRONIC SYSTEM TECH BLD 34.59 37.70 +3.11 57.90 61.10 +3.20
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 38.23 40.28 +2.05 57.81 61.01 +3.20 IRON WORKER ALL 41.65 43.35 +1.70 72.83 75.33 +2.50 PAINTER BLD 32.47 33.79 +1.32 54.24 55.74 +1.50 PAINTER HWY 36.77 38.09 +1.32 58.54 60.04 +1.50 PAINTER OVER 30 FT. BLD 34.47 35.79 +1.32 56.24 57.74 +1.50 PAINTER PWR EQMT BLD 33.47 34.79 +1.32 55.24 56.74 +1.50 PAINTER PWR EQMT HWY 37.77 39.09 +1.32 59.54 61.04 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN BLD 48.10 49.63 +1.53 70.37 72.14 +1.77 ELECTRONIC SYSTEM TECH BLD 38.91 39.41 +0.50 57.90 61.10 +3.20 PAINTER ALL 31.50 31.90 +0.40 57.05 58.55 +1.50 PAINTER OVER 30 FT. ALL 32.50 32.90 +0.40 58.05 59.55 +1.50 PAINTER PWR EQMT ALL 32.25 32.65 +0.40 57.80 59.30 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN BLD 40.00 42.00 +2.00 62.50 64.73 +2.23 ELECTRONIC SYSTEM TECH BLD 34.59 37.70 +3.11 57.90 61.10 +3.20 PAINTER BLD 33.49 34.49 +1.00 57.12 58.62 +1.50 PAINTER HWY 34.69 35.69 +1.00 58.32 59.82 +1.50 PAINTER OVER 30 FT. BLD 34.49 35.49 +1.00 58.12 59.62 +1.50 PAINTER PWR EQMT BLD 34.49 35.49 +1.00 58.12 59.62 +1.50 PAINTER PWR EQMT HWY 35.69 36.69 +1.00 59.32 60.82 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 38.23 40.28 +2.05 57.81 61.01 +3.20 PAINTER BLD 32.47 33.79 +1.32 54.24 55.74 +1.50 PAINTER HWY 36.77 38.09 +1.32 58.54 60.04 +1.50 PAINTER OVER 30 FT. BLD 34.47 35.79 +1.32 56.24 57.74 +1.50 PAINTER PWR EQMT BLD 33.47 34.79 +1.32 55.24 56.74 +1.50 PAINTER PWR EQMT HWY 37.77 39.09 +1.32 59.54 61.04 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 38.23 40.28 +2.05 57.81 61.01 +3.20 PAINTER BLD 32.47 33.79 +1.32 54.24 55.74 +1.50 PAINTER HWY 36.77 38.09 +1.32 58.54 60.04 +1.50 PAINTER OVER 30 FT. BLD 34.47 35.79 +1.32 56.24 57.74 +1.50 PAINTER PWR EQMT BLD 33.47 34.79 +1.32 55.24 56.74 +1.50 PAINTER PWR EQMT HWY 37.77 39.09 +1.32 59.54 61.04 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN ALL 49.67 52.41 +2.74 78.64 82.67 +4.03 ELECTRONIC SYSTEM TECH BLD 39.14 41.76 +2.62 57.12 60.26 +3.14 ELECTRONIC SYSTEM TECH BLD 38.23 40.28 +2.05 57.81 61.01 +3.20 IRON WORKER ALL 41.65 43.35 +1.70 72.83 75.33 +2.50 PAINTER BLD 32.47 33.79 +1.32 54.24 55.74 +1.50 PAINTER HWY 36.77 38.09 +1.32 58.54 60.04 +1.50 PAINTER OVER 30 FT. BLD 34.47 35.79 +1.32 56.24 57.74 +1.50 PAINTER PWR EQMT BLD 33.47 34.79 +1.32 55.24 56.74 +1.50 PAINTER PWR EQMT HWY 37.77 39.09 +1.32 59.54 61.04 +1.50 PLUMBER BLD 43.75 47.85 +4.10 65.00 71.05 +6.05
Classification Old base New base Δ base Old package New package Δ package
PAINTER ALL 30.50 31.75 +1.25 56.12 57.62 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 38.23 40.28 +2.05 57.81 61.01 +3.20 PAINTER BLD 32.47 33.79 +1.32 54.24 55.74 +1.50 PAINTER HWY 36.77 38.09 +1.32 58.54 60.04 +1.50 PAINTER OVER 30 FT. BLD 34.47 35.79 +1.32 56.24 57.74 +1.50 PAINTER PWR EQMT BLD 33.47 34.79 +1.32 55.24 56.74 +1.50 PAINTER PWR EQMT HWY 37.77 39.09 +1.32 59.54 61.04 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 36.75 39.66 +2.91 57.90 61.10 +3.20 PAINTER ALL 32.82 33.82 +1.00 57.06 58.56 +1.50 PAINTER - SIGNS ALL 32.82 33.82 +1.00 57.06 58.56 +1.50 PAINTER OVER 30 FT. ALL 33.82 34.82 +1.00 58.06 59.56 +1.50 PAINTER PWR EQMT ALL 33.82 34.82 +1.00 58.06 59.56 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN BLD 40.00 42.00 +2.00 62.50 64.73 +2.23 ELECTRONIC SYSTEM TECH BLD 34.59 37.70 +3.11 57.90 61.10 +3.20
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 36.75 39.66 +2.91 57.90 61.10 +3.20 PAINTER ALL 32.82 33.82 +1.00 57.06 58.56 +1.50 PAINTER OVER 30 FT. ALL 33.82 34.82 +1.00 58.06 59.56 +1.50 PAINTER PWR EQMT ALL 33.82 34.82 +1.00 58.06 59.56 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 38.91 39.41 +0.50 57.90 61.10 +3.20 PAINTER ALL 31.50 31.90 +0.40 57.05 58.55 +1.50 PAINTER OVER 30 FT. ALL 32.50 32.90 +0.40 58.05 59.55 +1.50 PAINTER PWR EQMT ALL 32.25 32.65 +0.40 57.80 59.30 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN ALL 49.67 52.41 +2.74 78.64 82.67 +4.03 ELECTRONIC SYSTEM TECH BLD 39.14 41.76 +2.62 57.12 60.26 +3.14 IRON WORKER ALL 41.65 43.35 +1.70 72.83 75.33 +2.50 PAINTER BLD 33.49 34.49 +1.00 57.12 58.62 +1.50 PAINTER HWY 34.69 35.69 +1.00 58.32 59.82 +1.50 PAINTER OVER 30 FT. BLD 34.49 35.49 +1.00 58.12 59.62 +1.50 PAINTER PWR EQMT BLD 34.49 35.49 +1.00 58.12 59.62 +1.50 PAINTER PWR EQMT HWY 35.69 36.69 +1.00 59.32 60.82 +1.50 PLUMBER BLD 43.75 47.85 +4.10 65.00 71.05 +6.05
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN BLD 44.10 45.65 +1.55 70.70 72.42 +1.72 ELECTRONIC SYSTEM TECH BLD 34.59 37.70 +3.11 57.90 61.10 +3.20
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN BLD 44.10 45.65 +1.55 70.70 72.42 +1.72 ELECTRONIC SYSTEM TECH BLD 34.59 37.70 +3.11 57.90 61.10 +3.20
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 38.23 40.28 +2.05 57.81 61.01 +3.20 PAINTER BLD 32.47 33.79 +1.32 54.24 55.74 +1.50 PAINTER HWY 36.77 38.09 +1.32 58.54 60.04 +1.50 PAINTER OVER 30 FT. BLD 34.47 35.79 +1.32 56.24 57.74 +1.50 PAINTER PWR EQMT BLD 33.47 34.79 +1.32 55.24 56.74 +1.50 PAINTER PWR EQMT HWY 37.77 39.09 +1.32 59.54 61.04 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 38.64 40.64 +2.00 57.90 61.10 +3.20 PAINTER ALL 39.54 40.96 +1.42 58.54 60.04 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN BLD 44.10 45.65 +1.55 70.70 72.42 +1.72 ELECTRONIC SYSTEM TECH BLD 34.59 37.70 +3.11 57.90 61.10 +3.20
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN ALL 49.67 52.41 +2.74 78.64 82.67 +4.03 ELECTRONIC SYSTEM TECH BLD 38.23 40.28 +2.05 57.81 61.01 +3.20 IRON WORKER ALL 41.65 43.35 +1.70 72.83 75.33 +2.50 PAINTER BLD 33.49 34.49 +1.00 57.12 58.62 +1.50 PAINTER HWY 34.69 35.69 +1.00 58.32 59.82 +1.50 PAINTER OVER 30 FT. BLD 34.49 35.49 +1.00 58.12 59.62 +1.50 PAINTER PWR EQMT BLD 34.49 35.49 +1.00 58.12 59.62 +1.50 PAINTER PWR EQMT HWY 35.69 36.69 +1.00 59.32 60.82 +1.50 PIPEFITTER BLD 42.75 45.00 +2.25 64.06 66.54 +2.48 PLUMBER BLD 42.75 45.00 +2.25 64.06 66.54 +2.48
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 38.23 40.28 +2.05 57.81 61.01 +3.20 PAINTER ALL 27.13 27.43 +0.30 49.76 51.26 +1.50 PAINTER OVER 30 FT. ALL 30.23 30.53 +0.30 52.86 54.36 +1.50 PAINTER PWR EQMT ALL 30.23 30.53 +0.30 52.86 54.36 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 38.23 40.28 +2.05 57.81 61.01 +3.20
Classification Old base New base Δ base Old package New package Δ package
ELECTRONIC SYSTEM TECH BLD 38.23 40.28 +2.05 57.81 61.01 +3.20 PAINTER BLD 32.47 33.79 +1.32 54.24 55.74 +1.50 PAINTER HWY 36.77 38.09 +1.32 58.54 60.04 +1.50 PAINTER OVER 30 FT. BLD 34.47 35.79 +1.32 56.24 57.74 +1.50 PAINTER PWR EQMT BLD 33.47 34.79 +1.32 55.24 56.74 +1.50 PAINTER PWR EQMT HWY 37.77 39.09 +1.32 59.54 61.04 +1.50
Classification Old base New base Δ base Old package New package Δ package
ELECTRICIAN BLD 48.10 49.63 +1.53 70.37 72.14 +1.77 ELECTRICIAN BLD 44.10 45.65 +1.55 70.70 72.42 +1.72 ELECTRONIC SYSTEM TECH BLD 34.59 37.70 +3.11 57.90 61.10 +3.20
Know within 24 hours
IDOL posts a new schedule 6 to 9 times a year and sends no alert. RateWatch diffs every county daily and emails you only when yours changes: old rate, new rate, fringe package, effective date, CSV attached.
One caught change pays for years of the subscription. Watch one county free.
Watch a county free
Source: Illinois Department of Labor county prevailing wage schedules (labor.illinois.gov ). IDOL is the sole authority; confirm against the published schedule before running payroll. RateWatch reads public data only and never guesses: anything the parser cannot place is flagged for review, never inferred.
Data current through the IDOL release effective August 15, 2026, from stored schedule snapshots. Checked daily.